Reference projects
Reference projects
Selected projects from three decades of certified inspections — from the Rio–Antirrio Bridge to Hellenic Navy submarines.
Industry Sugar Packaging Plant — Lagos, Nigeria Construction supervision of a sugar packaging plant with 1.5 M tonnes annual capacity — from prefabrication in India to commissioning. Shipping MAN B&W main engine installation on a 183 m tanker Installation of a MAN B&W 6S50MC-C main engine (215 t), intermediate and tail shafts with their bearings, and in-situ grinding on the stern tube boss. Shipping Rudder repair on a 330 m tanker Rudder repair after total damage of the top thrust bearing and partial damage of the rudder carrier and split bearing ring. Rail STASY (Attiko Metro) Quality control with non-destructive testing methods. Infrastructure Rio–Antirrio Bridge — steel structure weld inspection Inspection of fillet and butt welds with ultrasonic and magnetic particle methods on the bridge's steel structure. Energy DEPA — Revythousa cryogenic (LNG) station Final examination of weld X-ray films from the cryogenic station's construction, as RT Level 3. Defence Submarine NIREUS — torpedo tubes UT thickness mapping of the torpedo tubes and authoring of the welding procedure specification (WPS) for their repair, after a public tender. Infrastructure OAKA Olympic Stadium — Calatrava roof Expert consultant for the weld-quality inspection of the Calatrava structure at the Olympic Stadium. Infrastructure Athens 2004 Olympic Games — EYDE/OE 2004 projects Expert consultant for the Athens 2004 Olympic Games projects (EYDE/OE 2004). Energy PPC — vibration measurements at power plants Vibration measurements and analysis at PPC's power generation plants. Aviation Ground equipment at "Eleftherios Venizelos" Vibration measurements on TRX200S & ZH50HTR machines at Athens International Airport, Spata. Offshore Drilling rig "Atwood Eagle" — weld inspection Eddy Current inspection of welds on the drilling rig "Atwood Eagle" at Elefsis Shipyard, Greece.
Need a certified inspection?
Describe the problem — we reply with a specific method, schedule and cost.